Dams and Hydraulic Structures MCQs 2026
70 questions with detailed answers · 28 from past papers · 7 quiz batches available
Choose a Quiz Batch. Each batch has 10 questions from this topic, in order. Take them one by one to work through all 70 MCQs. Login to save your scores and see your best per batch.
Read each question, think about the answer, then click Show Answer to reveal the correct option and explanation. Load 10 at a time so it stays manageable — perfect for one-topic study sessions on the bus or during a break.
- Q1 Past Paper · PPSC/FPSC/NTS medium
Zoning in earth dam may include
💡 Explanation:Internal filters prevent piping between materials
- Q2 Past Paper · PPSC/FPSC/NTS easy
Safety inspection of dam includes checking
💡 Explanation:Regular inspection prevents catastrophic failure
- Q3 easy
Small dam or pond for community irrigation in Punjab often
💡 Explanation:Minor irrigation structures common in rural areas
- Q4 Past Paper · PPSC/FPSC/NTS medium
Central Asia and Himalayan dams face challenge of
💡 Explanation:Pakistan dam design reflects Indus basin conditions
- Q5 hard
Earthquake induced hydrodynamic pressure on dam face computed using
💡 Explanation:Reservoir water adds inertia load during shaking
- Q6 hard
Morning glory spillway is
💡 Explanation:Shaft spill used where space limited on crest
- Q7 hard
Flip bucket on spillway throws jet
💡 Explanation:Ski jump dissipates energy in air and plunge pool
- Q8 hard
Labyrinth weir increases
💡 Explanation:Labyrinth spillway passes more flow per width
- Q9 easy
Joint in concrete dam accommodates
💡 Explanation:Water stops and joint fillers prevent leakage
- Q10 medium
Wave height on reservoir fetch depends on
💡 Explanation:Wind setup added to freeboard on large reservoirs
- Q11 Past Paper · PPSC/FPSC/NTS medium
Dam safety review in Pakistan considers
💡 Explanation:Periodic review mandated for large storage dams
- Q12 Past Paper · PPSC/FPSC/NTS medium
Sediment flushing through low level outlets helps
💡 Explanation:Drawdown flushing vent sediment during monsoon
- Q13 medium
Tailwater rating curve relates
💡 Explanation:Tailwater affects turbine efficiency and draft tube
- Q14 hard
Dam break analysis provides
💡 Explanation:Emergency planning uses breach flood routing
- Q15 hard
Underground powerhouse advantage is
💡 Explanation:Cavern housing turbines in mountain projects
- Q16 Past Paper · PPSC/FPSC/NTS easy
Barrage on river like Sukkur Barrage primarily
💡 Explanation:Barrages control level for canal headworks
- Q17 medium
Regulator dam or weir differs from storage dam by
💡 Explanation:Headworks divert irrigation water on rivers
- Q18 hard
Air entrainment on spillway face reduces
💡 Explanation:Aerated flow protects ogee surface
- Q19 hard
Cavitation in spillway or turbine occurs when
💡 Explanation:Cavitation damages concrete and metal surfaces
- Q20 easy
Trash rack at intake stops
💡 Explanation:Racks protect turbines from logs ice debris
- Q21 medium
Penstock bifurcation near powerhouse splits flow to
💡 Explanation:Manifold distributes design discharge
- Q22 hard
Routing flood through reservoir uses
💡 Explanation:Flood routing mass balance inflow outflow storage change
- Q23 hard
Probable maximum precipitation used to estimate
💡 Explanation:PMP drives spillway inflow design storms
- Q24 medium
Hydraulic height of dam is
💡 Explanation:Height parameter in hazard classification
- Q25 medium
Homogeneous earth dam relies on
💡 Explanation:Homogeneous section simpler but needs adequate width
- Q26 hard
Emergency spillway or fuse plug used when
💡 Explanation:Erosion-resistant fuse plug lowers crest in extreme flood
- Q27 hard
Spillway chute blocks or dentated sill enhance
💡 Explanation:Accessories stabilize jump and reduce exit velocity
- Q28 medium
Gallery drainage holes relieve
💡 Explanation:Drains lower pressure behind face
- Q29 hard
Drawdown curve during rapid reservoir lowering can cause
💡 Explanation:Sudden drawdown increases seepage forces on slopes
- Q30 Past Paper · PPSC/FPSC/NTS medium
Piezometer measures
💡 Explanation:Excess pore pressure warns of seepage problems
- Q31 medium
Instrumentation on dam includes
💡 Explanation:Monitoring detects abnormal behaviour early
- Q32 easy
Fish ladder at dam allows
💡 Explanation:Environmental mitigation on some projects
- Q33 medium
Low level outlet provides
💡 Explanation:Outlet works release water when spillway insufficient
- Q34 hard
Rule curve for reservoir operation guides
💡 Explanation:Operating rules balance flood control irrigation power
- Q35 easy
Live storage used for
💡 Explanation:Active conservation storage between dead and full levels
- Q36 easy
Dead storage in reservoir holds
💡 Explanation:Dead pool cannot be used for supply or power
- Q37 medium
Afflux upstream of dam raises
💡 Explanation:Backwater affects bridges and property limits
- Q38 Past Paper · PPSC/FPSC/NTS hard
Spillway design flood often based on
💡 Explanation:Large dams use extreme flood criteria
- Q39 hard
Buttress dam economic when
💡 Explanation:Buttress reduces volume versus solid gravity
- Q40 medium
Arch dam suitable when
💡 Explanation:Geometry and geology must suit arch action
- Q41 medium
RCC dam construction places concrete in
💡 Explanation:RCC allows rapid dam raising with lower cost
- Q42 easy
Riprap on upstream slope protects against
💡 Explanation:Rock armour resists reservoir wave action
- Q43 medium
Horizontal drain on downstream toe of earth dam
💡 Explanation:Toe drain collects seepage safely
- Q44 Past Paper · PPSC/FPSC/NTS hard
Piping failure in earth dam occurs when
💡 Explanation:Piping can lead to sudden breach; filters prevent it
- Q45 Past Paper · PPSC/FPSC/NTS medium
Earthquake load on dam analysed using
💡 Explanation:Seismic coefficients per building codes for dams
- Q46 hard
Ice load on dam in cold regions adds to
💡 Explanation:Less relevant in Pakistan lowland dams but in high altitude
- Q47 Past Paper · PPSC/FPSC/NTS hard
Factor of safety against sliding on gravity dam considers
💡 Explanation:Sliding along foundation plane critical check
- Q48 Past Paper · PPSC/FPSC/NTS medium
Diamer Basha dam planned as
💡 Explanation:DBC on Indus adds storage and flood control
- Q49 Past Paper · PPSC/FPSC/NTS easy
Mangla dam primarily serves
💡 Explanation:Mangla one of oldest large dams of Pakistan
- Q50 Past Paper · PPSC/FPSC/NTS easy
Tarbela dam on Indus is primarily
💡 Explanation:Tarbela major storage and power for Pakistan
- Q51 easy
Tailrace channel returns
💡 Explanation:Tailwater level affects turbine output
- Q52 Past Paper · PPSC/FPSC/NTS medium
Surge tank on hydropower scheme controls
💡 Explanation:Surge tank absorbs water hammer in long penstock
- Q53 Past Paper · PPSC/FPSC/NTS easy
Penstock conveys
💡 Explanation:Steel or concrete lined pipe withstands high head
- Q54 easy
Intake structure withdraws
💡 Explanation:Intake screens trash racks and gates control flow
- Q55 easy
Cofferdam is
💡 Explanation:Rockfill or sheet pile cofferdam protects excavation
- Q56 Past Paper · PPSC/FPSC/NTS medium
Diversion tunnel during dam construction carries
💡 Explanation:Cofferdam and tunnel divert river for dry foundation
- Q57 Past Paper · PPSC/FPSC/NTS easy
Reservoir sedimentation reduces
💡 Explanation:Indus tributaries carry high sediment affecting Tarbela Mangla
- Q58 Past Paper · PPSC/FPSC/NTS hard
Uplift pressure on gravity dam reduces
💡 Explanation:Drainage and cutoff reduce harmful uplift
- Q59 Past Paper · PPSC/FPSC/NTS easy
Freeboard on dam crest provides
💡 Explanation:Freeboard = normal pool to crest minus wave setup
- Q60 Past Paper · PPSC/FPSC/NTS medium
Phreatic line in earth dam should remain
💡 Explanation:Seepage line indicates unsaturated zone safety
- Q61 Past Paper · PPSC/FPSC/NTS medium
Grout curtain reduces
💡 Explanation:Deep holes filled with cement grout seal rock joints
- Q62 easy
Gallery inside dam used for
💡 Explanation:Gallery monitors seepage and structural behaviour
- Q63 medium
Stilling basin designed for
💡 Explanation:Basin dimensions fix jump location and stability
- Q64 Past Paper · PPSC/FPSC/NTS medium
Energy dissipator downstream of spillway prevents
💡 Explanation:Hydraulic jump basin stilling blocks reduce exit velocity
- Q65 Past Paper · PPSC/FPSC/NTS medium
Ogee spillway profile matches
💡 Explanation:Ogee shape ensures controlled flow and aeration
- Q66 Past Paper · PPSC/FPSC/NTS easy
Spillway safely passes
💡 Explanation:Spillway prevents overtopping failure of dam
- Q67 Past Paper · PPSC/FPSC/NTS easy
Earth dam core function is
💡 Explanation:Central clay core or asphalt face limits leakage
- Q68 medium
Buttress dam has
💡 Explanation:Buttresses spaced reduce concrete volume
- Q69 Past Paper · PPSC/FPSC/NTS medium
Arch dam transfers load to
💡 Explanation:Thin arch efficient in narrow rocky gorges
- Q70 Past Paper · PPSC/FPSC/NTS easy
Gravity dam resists water pressure mainly by
💡 Explanation:Concrete gravity section stable against overturning and sliding