    Pakistan Building Code BCP SP 2007 covers

    1. A Only railway signalling
    2. B Only harbour dredging
    3. C Only airport ILS only
    4. D Structural fire and general building requirements
    💡 Explanation:

    BCP adopted for engineered construction nationwide

  2. Q2 Past Paper · PPSC/FPSC/NTS medium

    Seismic zone 4 in Pakistan BCP applies to areas like

    1. A Entire country uniformly zone 4
    2. B Parts of KPK and Kashmir high hazard
    3. C No zone 4 exists
    4. D Only Karachi harbour only
    💡 Explanation:

    Zone 4 highest mapped seismicity in BCP maps

  3. Q3 Past Paper · PPSC/FPSC/NTS medium

    Basic wind speed in BCP selected using

    1. A Only random choice
    2. B Only historical earthquake
    3. C Wind map and importance of structure
    4. D Only soil colour
    💡 Explanation:

    Wind load design per hourly mean recurrence interval

  4. Q4 Past Paper · PPSC/FPSC/NTS easy

    Live load on residential floor per BCP order of

    1. A 2 kN/m² or as specified in code
    2. B 50 kN/m² always
    3. C Zero live load allowed
    4. D 200 kN/m²
    💡 Explanation:

    Occupancy categories define imposed loads

  5. Q5 Past Paper · PPSC/FPSC/NTS easy

    Dead load includes

    1. A Only furniture people
    2. B Only wind gust
    3. C Self weight of structure and permanent fixtures
    4. D Only earthquake force
    💡 Explanation:

    Permanent loads from materials fixed equipment

  6. Q6 medium

    Fire resistance rating means

    1. A Time to paint building
    2. B Time to build foundation
    3. C Time to submit BOQ
    4. D Duration element resists fire under standard test
    💡 Explanation:

    Rating in hours for walls floors columns

  7. Q7 Past Paper · PPSC/FPSC/NTS medium

    Means of egress includes

    1. A Exit access exit and exit discharge
    2. B Only elevator for all occupancies always
    3. C Only window display
    4. D Only roof garden
    💡 Explanation:

    Safe evacuation path required by fire provisions

  8. Q8 medium

    Occupant load calculated from

    1. A Only building height
    2. B Floor area and load factor for use
    3. C Only wind speed
    4. D Only seismic zone only
    💡 Explanation:

    Assembly uses higher load factor than office

  9. Q9 easy

    Structural requirements in BCP reference

    1. A Only oral tradition
    2. B Only vendor brochure
    3. C Only social media
    4. D ACI AISC and other adopted standards
    💡 Explanation:

    Pakistan code adapts international material standards

  10. Q10 Past Paper · PPSC/FPSC/NTS medium

    Reinforcement detailing for seismic zones requires

    1. A No ties anywhere
    2. B Zero cover always
    3. C Closer ties and development lengths
    4. D Plastic bars only
    💡 Explanation:

    Ductile detailing per BCP seismic sections

  11. Q11 Past Paper · PPSC/FPSC/NTS easy

    Minimum concrete cover to reinforcement protects against

    1. A Only paint adhesion
    2. B Corrosion and fire
    3. C Only tile bonding
    4. D Only acoustic insulation only
    💡 Explanation:

    Cover specified by exposure and fire rating

  12. Q12 Past Paper · PPSC/FPSC/NTS easy

    Foundation requirements depend on

    1. A Soil bearing capacity and loads
    2. B Only facade colour
    3. C Only roof brand
    4. D Only window tint
    💡 Explanation:

    Shallow or deep foundation per geotechnical report

  13. Q13 Past Paper · PPSC/FPSC/NTS easy

    National Building Code NBC context in Pakistan often refers to

    1. A Only foreign code without adoption
    2. B Only railway manual
    3. C BCP SP 2007 and municipal bylaws
    4. D Only airport annex only
    💡 Explanation:

    Local authorities enforce BCP plus city regulations

  14. Q14 Past Paper · PPSC/FPSC/NTS easy

    Zoning in municipal bylaws controls

    1. A Only interior paint colour
    2. B Only staff uniform
    3. C Only vehicle tyre size
    4. D Land use density and building type
    💡 Explanation:

    Residential commercial industrial zones in master plans

  15. Q15 Past Paper · PPSC/FPSC/NTS easy

    Setback from plot boundary required for

    1. A Light ventilation and fire access
    2. B Only decoration
    3. C Only advertising only
    4. D Only parking ticket
    💡 Explanation:

    Front side rear setbacks in Lahore Karachi Islamabad bylaws

  16. Q16 Past Paper · PPSC/FPSC/NTS medium

    Building height limit in cities governed by

    1. A Only owner preference unlimited always
    2. B Zoning FAR and aviation restrictions
    3. C Only contractor wish
    4. D Only random dice
    💡 Explanation:

    Height controlled near airports and for infrastructure capacity

  17. Q17 Past Paper · PPSC/FPSC/NTS medium

    FAR floor area ratio equals

    1. A Plot width only
    2. B Building colour depth
    3. C Wind speed ratio
    4. D Total floor area divided by plot area
    💡 Explanation:

    FAR controls density in urban planning

  18. Q18 easy

    FSI same concept as FAR means

    1. A Floor space index limiting built area
    2. B Foundation soil index
    3. C Fire safety index only
    4. D Fuel storage index
    💡 Explanation:

    Used interchangeably with FAR in planning documents

  19. Q19 medium

    Wind load increases with

    1. A Underground basement depth only
    2. B Building height and exposure category
    3. C Only seismic zone only without height
    4. D Only paint thickness
    💡 Explanation:

    Tall buildings face higher design wind pressures

  20. Q20 medium

    Importance factor for hospital in seismic design is

    1. A Lower than all others always
    2. B Zero always
    3. C Higher than ordinary storage building
    4. D Same as temporary tent always
    💡 Explanation:

    Critical facilities designed for enhanced safety

  21. Q21 Past Paper · PPSC/FPSC/NTS medium

    Fire compartmentation purpose is

    1. A Increase fire spread
    2. B Remove all exits
    3. C Block ventilation always completely
    4. D Limit fire spread within building
    💡 Explanation:

    Fire walls and doors contain smoke and flame

  22. Q22 medium

    Sprinkler system requirement depends on

    1. A Occupancy height and area thresholds
    2. B Only owner hobby
    3. C Only exterior paint
    4. D Only carpet pattern
    💡 Explanation:

    High rise and assembly occupancies often require sprinklers

  23. Q23 easy

    Stair width determined by

    1. A Only aesthetic choice
    2. B Only seismic zone alone
    3. C Occupant load and egress capacity
    4. D Only wind direction
    💡 Explanation:

    Exit capacity code ensures timely evacuation

  24. Q24 easy

    Handrail height on stairs approximately

    1. A 200 mm
    2. B 900 to 1050 mm per codes
    3. C 2 m always
    4. D Zero mm
    💡 Explanation:

    Guards prevent falls on stairs and balconies

  25. Q25 easy

    Balcony guard height requirement protects

    1. A Against falling from elevated floor
    2. B Only rain ingress
    3. C Only wind uplift on tiles only
    4. D Only solar gain
    💡 Explanation:

    Minimum height and non-climbable openings

  26. Q26 Past Paper · PPSC/FPSC/NTS medium

    Lateral force resisting system must provide

    1. A Only decorative function
    2. B Complete load path to foundation
    3. C Only thermal insulation
    4. D Only acoustic absorption only
    💡 Explanation:

    Diaphragms collectors and foundations complete chain

  27. Q27 medium

    Expansion joint spacing in long building reduces

    1. A Seismic demand to zero always
    2. B Need for any steel
    3. C Temperature and shrinkage cracking
    4. D Need for foundations
    💡 Explanation:

    Joint spacing depends on material and exposure

  28. Q28 easy

    Concrete grade for structural members in Pakistan commonly minimum

    1. A Always M5 regardless
    2. B Zero strength mud always
    3. C Only aggregate without cement
    4. D As specified in BCP ACI for exposure
    💡 Explanation:

    Higher grades for higher stress and durability

  29. Q29 medium

    Development length of rebar ensures

    1. A Only visual alignment
    2. B Adequate bond with concrete
    3. C Only colour match
    4. D Only magnetic effect
    💡 Explanation:

    Without enough length bar pulls out under load

  30. Q30 Past Paper · PPSC/FPSC/NTS hard

    Lap splice not permitted in plastic hinge region per seismic detailing because

    1. A Lap always stronger everywhere without limit
    2. B Code prefers random placement
    3. C Lap reduces cost always primary reason
    4. D Bond may degrade under cyclic loading
    💡 Explanation:

    Mechanical couplers or offset splices used instead

  31. Q31 medium

    Shear wall minimum reinforcement includes

    1. A Only paint mesh
    2. B Zero reinforcement allowed
    3. C Horizontal and vertical bars
    4. D Only glass fibre without steel
    💡 Explanation:

    Walls need boundary confinement in seismic zones

  32. Q32 hard

    Soft storey prohibition addressed by

    1. A Stiffness checks and stronger lower storey
    2. B Removing all columns ground floor
    3. C Infinite openings without bracing
    4. D Using only glass walls ground floor
    💡 Explanation:

    Irregularity provisions in BCP seismic chapter

  33. Q33 Past Paper · PPSC/FPSC/NTS medium

    Soil bearing pressure verified by

    1. A Guess without test always
    2. B Only wind tunnel
    3. C Only paint test
    4. D Plate load or SPT correlation before design
    💡 Explanation:

    Geotechnical report mandatory for high-rise permits

  34. Q34 easy

    Raft foundation used when

    1. A Only on rock cliff always
    2. B Soil capacity low or loads heavy uniform
    3. C Only on single column only always
    4. D Never in Pakistan
    💡 Explanation:

    Mat spreads load reducing bearing pressure

  35. Q35 Past Paper · PPSC/FPSC/NTS easy

    Pile foundation needed when

    1. A Always cheaper than all footings always without exception
    2. B Only for fences
    3. C Weak upper soil over competent stratum
    4. D Only for paint booths
    💡 Explanation:

    End bearing or friction piles carry load down

  36. Q36 easy

    Fire exit door must swing

    1. A In direction of egress travel generally
    2. B Always inward into room during escape always wrong way
    3. C Never open
    4. D Only slide horizontally always without exception
    💡 Explanation:

    Outward swing aids evacuation except specific cases

  37. Q37 medium

    Travel distance to exit limited to

    1. A Unlimited any distance
    2. B Protect occupants before untenable conditions
    3. C Only 1 metre always everywhere
    4. D Only 10 km
    💡 Explanation:

    Maximum travel per occupancy and sprinkler status

  38. Q38 hard

    Dead load reduction factor not applied to

    1. A All loads always reduced 50 percent
    2. B Nothing ever uses factors
    3. C Permanent structural self weight in stability
    4. D Only live load only ever considered
    💡 Explanation:

    Load combinations per BCP for strength and serviceability

  39. Q39 hard

    Live load reduction permitted for

    1. A Single chair only
    2. B All loads always without limit to zero
    3. C Earthquake load always reduced 90 percent
    4. D Large influence areas columns support many floors
    💡 Explanation:

    Reduction factors in code with upper limits

  40. Q40 hard

    Wind tunnel test used for

    1. A Tall iconic buildings with complex shape
    2. B Every village house mandatory
    3. C Only foundations only
    4. D Only paint selection
    💡 Explanation:

    When code analytical method inadequate for aerodynamics

  41. Q41 easy

    Parapet wall design must resist

    1. A Only decorative paint
    2. B Wind load and provide fall protection
    3. C Only internal HVAC
    4. D Only elevator load
    💡 Explanation:

    Height and anchorage per code

  42. Q42 medium

    Accessibility requirements include

    1. A Only stairs without lifts always
    2. B Only narrow doors
    3. C Ramps rails and door widths for disabled
    4. D Only steps at all entrances
    💡 Explanation:

    Universal design increasingly in municipal bylaws

  43. Q43 medium

    Energy provisions in modern codes may address

    1. A Only structural steel grade
    2. B Only harbour dredging
    3. C Only railway gauge
    4. D Thermal insulation and ventilation
    💡 Explanation:

    Insulation reduces HVAC load in commercial buildings

  44. Q44 Past Paper · PPSC/FPSC/NTS easy

    Municipal building permit requires

    1. A Approved drawings structural calculations NOCs
    2. B Only verbal description
    3. C Only photo of model
    4. D Only handshake
    💡 Explanation:

    DAE submits to CDA LDA RDA etc for approval

  45. Q45 Past Paper · PPSC/FPSC/NTS easy

    Occupancy certificate issued after

    1. A At excavation start
    2. B Before foundation
    3. C Without any inspection
    4. D Completion inspection meets approved plans
    💡 Explanation:

    OC legalizes building use after code compliance

  46. Q46 Past Paper · PPSC/FPSC/NTS easy

    Illegal construction risk includes

    1. A Automatic code compliance
    2. B Free upgrade by government always
    3. C Demolition penalties and safety hazard
    4. D Tax refund always
    💡 Explanation:

    Unauthorized extra floors common enforcement issue in cities

  47. Q47 medium

    High rise defined in many bylaws as building exceeding

    1. A Specific height or storey count like 4 storeys plus
    2. B Only single storey always
    3. C Only underground only
    4. D Only temporary tent
    💡 Explanation:

    Additional fire and structural rules apply

  48. Q48 easy

    Parapet height and roof access guarded per code to prevent

    1. A Only bird nesting only without safety
    2. B Falls during maintenance
    3. C Only solar panel colour
    4. D Only antenna brand
    💡 Explanation:

    Roof safety for equipment servicing

  49. Q49 Past Paper · PPSC/FPSC/NTS medium

    Structural peer review required for

    1. A Single room mud house always exempt typical
    2. B All dog houses
    3. C Major complex buildings in many authorities
    4. D All billboards only
    💡 Explanation:

    Third party check of calculations for tall buildings

  50. Q50 medium

    Soil test minimum boreholes for high rise typically

    1. A Zero holes always
    2. B One hole anywhere without plan always sufficient always
    3. C Only scrape surface
    4. D Several across footprint per geotechnical practice
    💡 Explanation:

    Variability of urban fill requires adequate exploration

  51. Q51 Past Paper · PPSC/FPSC/NTS medium

    Basement waterproofing required when

    1. A Groundwater table may intersect basement
    2. B Never in any city
    3. C Only for roofs
    4. D Only for windows
    💡 Explanation:

    Karachi Lahore high water table needs tanking or drainage

  52. Q52 hard

    Column splice location preferred at

    1. A Maximum moment mid height always
    2. B Floor level where moment lower
    3. C Random without analysis
    4. D Below foundation in soil
    💡 Explanation:

    Constructability and structural logic guide splice placement

  53. Q53 medium

    Cantilever slab design checks

    1. A Only paint colour
    2. B Only tile weight ignored always
    3. C Only wind on roof ignored always
    4. D Negative moment at support and deflection
    💡 Explanation:

    Balconies common failure point if under-designed

  54. Q54 Past Paper · PPSC/FPSC/NTS medium

    Strengthening existing building for extra floor requires

    1. A Only paint refresh
    2. B Only new signage
    3. C Assessment of foundation columns and slabs capacity
    4. D Only carpet
    💡 Explanation:

    Illegal additions cause collapses in dense urban areas

  55. Q55 easy

    Building line on street defined in master plan as

    1. A Interior paint boundary
    2. B Limit beyond which structure cannot project
    3. C Kitchen location
    4. D Elevator brand line
    💡 Explanation:

    Setback plus building line control streetscape

  56. Q56 Past Paper · PPSC/FPSC/NTS medium

    Parking requirement in commercial zoning based on

    1. A Floor area or seats per bylaw
    2. B Only owner car count wish
    3. C Zero parking always mandated
    4. D Only bicycle always without cars ever
    💡 Explanation:

    CDA LDA require minimum off-street parking

  57. Q57 medium

    Rainwater downpipe sizing based on

    1. A Only wind speed
    2. B Roof area and rainfall intensity
    3. C Only seismic zone
    4. D Only FAR only
    💡 Explanation:

    Plumbing code links drainage to local design storm

  58. Q58 medium

    Lightning protection for tall buildings uses

    1. A Only plastic rods
    2. B Only paint coating
    3. C Air terminals and down conductors to earth
    4. D Only glass facade only
    💡 Explanation:

    Protection system per applicable standard where required

  59. Q59 easy

    Minimum ceiling height residential often about

    1. A 2.4 to 2.7 m clear per bylaws
    2. B 0.5 m
    3. C 10 m mandatory all rooms
    4. D No minimum ever
    💡 Explanation:

    Ventilation and habitability standards

  60. Q60 medium

    Party wall agreement needed when

    1. A Building in desert alone always
    2. B Only federal highway
    3. C Only airport runway
    4. D Building on shared boundary with neighbour
    💡 Explanation:

    Legal clearance for footing projection on boundary