- Q1 Past Paper · PPSC/FPSC/NTS easy
Pakistan Building Code BCP SP 2007 covers
💡 Explanation:BCP adopted for engineered construction nationwide
- Q2 Past Paper · PPSC/FPSC/NTS medium
Seismic zone 4 in Pakistan BCP applies to areas like
💡 Explanation:Zone 4 highest mapped seismicity in BCP maps
- Q3 Past Paper · PPSC/FPSC/NTS medium
Basic wind speed in BCP selected using
💡 Explanation:Wind load design per hourly mean recurrence interval
- Q4 Past Paper · PPSC/FPSC/NTS easy
Live load on residential floor per BCP order of
💡 Explanation:Occupancy categories define imposed loads
- Q5 Past Paper · PPSC/FPSC/NTS easy
Dead load includes
💡 Explanation:Permanent loads from materials fixed equipment
- Q6 medium
Fire resistance rating means
💡 Explanation:Rating in hours for walls floors columns
- Q7 Past Paper · PPSC/FPSC/NTS medium
Means of egress includes
💡 Explanation:Safe evacuation path required by fire provisions
- Q8 medium
Occupant load calculated from
💡 Explanation:Assembly uses higher load factor than office
- Q9 easy
Structural requirements in BCP reference
💡 Explanation:Pakistan code adapts international material standards
- Q10 Past Paper · PPSC/FPSC/NTS medium
Reinforcement detailing for seismic zones requires
💡 Explanation:Ductile detailing per BCP seismic sections
- Q11 Past Paper · PPSC/FPSC/NTS easy
Minimum concrete cover to reinforcement protects against
💡 Explanation:Cover specified by exposure and fire rating
- Q12 Past Paper · PPSC/FPSC/NTS easy
Foundation requirements depend on
💡 Explanation:Shallow or deep foundation per geotechnical report
- Q13 Past Paper · PPSC/FPSC/NTS easy
National Building Code NBC context in Pakistan often refers to
💡 Explanation:Local authorities enforce BCP plus city regulations
- Q14 Past Paper · PPSC/FPSC/NTS easy
Zoning in municipal bylaws controls
💡 Explanation:Residential commercial industrial zones in master plans
- Q15 Past Paper · PPSC/FPSC/NTS easy
Setback from plot boundary required for
💡 Explanation:Front side rear setbacks in Lahore Karachi Islamabad bylaws
- Q16 Past Paper · PPSC/FPSC/NTS medium
Building height limit in cities governed by
💡 Explanation:Height controlled near airports and for infrastructure capacity
- Q17 Past Paper · PPSC/FPSC/NTS medium
FAR floor area ratio equals
💡 Explanation:FAR controls density in urban planning
- Q18 easy
FSI same concept as FAR means
💡 Explanation:Used interchangeably with FAR in planning documents
- Q19 medium
Wind load increases with
💡 Explanation:Tall buildings face higher design wind pressures
- Q20 medium
Importance factor for hospital in seismic design is
💡 Explanation:Critical facilities designed for enhanced safety
- Q21 Past Paper · PPSC/FPSC/NTS medium
Fire compartmentation purpose is
💡 Explanation:Fire walls and doors contain smoke and flame
- Q22 medium
Sprinkler system requirement depends on
💡 Explanation:High rise and assembly occupancies often require sprinklers
- Q23 easy
Stair width determined by
💡 Explanation:Exit capacity code ensures timely evacuation
- Q24 easy
Handrail height on stairs approximately
💡 Explanation:Guards prevent falls on stairs and balconies
- Q25 easy
Balcony guard height requirement protects
💡 Explanation:Minimum height and non-climbable openings
- Q26 Past Paper · PPSC/FPSC/NTS medium
Lateral force resisting system must provide
💡 Explanation:Diaphragms collectors and foundations complete chain
- Q27 medium
Expansion joint spacing in long building reduces
💡 Explanation:Joint spacing depends on material and exposure
- Q28 easy
Concrete grade for structural members in Pakistan commonly minimum
💡 Explanation:Higher grades for higher stress and durability
- Q29 medium
Development length of rebar ensures
💡 Explanation:Without enough length bar pulls out under load
- Q30 Past Paper · PPSC/FPSC/NTS hard
Lap splice not permitted in plastic hinge region per seismic detailing because
💡 Explanation:Mechanical couplers or offset splices used instead
- Q31 medium
Shear wall minimum reinforcement includes
💡 Explanation:Walls need boundary confinement in seismic zones
- Q32 hard
Soft storey prohibition addressed by
💡 Explanation:Irregularity provisions in BCP seismic chapter
- Q33 Past Paper · PPSC/FPSC/NTS medium
Soil bearing pressure verified by
💡 Explanation:Geotechnical report mandatory for high-rise permits
- Q34 easy
Raft foundation used when
💡 Explanation:Mat spreads load reducing bearing pressure
- Q35 Past Paper · PPSC/FPSC/NTS easy
Pile foundation needed when
💡 Explanation:End bearing or friction piles carry load down
- Q36 easy
Fire exit door must swing
💡 Explanation:Outward swing aids evacuation except specific cases
- Q37 medium
Travel distance to exit limited to
💡 Explanation:Maximum travel per occupancy and sprinkler status
- Q38 hard
Dead load reduction factor not applied to
💡 Explanation:Load combinations per BCP for strength and serviceability
- Q39 hard
Live load reduction permitted for
💡 Explanation:Reduction factors in code with upper limits
- Q40 hard
Wind tunnel test used for
💡 Explanation:When code analytical method inadequate for aerodynamics
- Q41 easy
Parapet wall design must resist
💡 Explanation:Height and anchorage per code
- Q42 medium
Accessibility requirements include
💡 Explanation:Universal design increasingly in municipal bylaws
- Q43 medium
Energy provisions in modern codes may address
💡 Explanation:Insulation reduces HVAC load in commercial buildings
- Q44 Past Paper · PPSC/FPSC/NTS easy
Municipal building permit requires
💡 Explanation:DAE submits to CDA LDA RDA etc for approval
- Q45 Past Paper · PPSC/FPSC/NTS easy
Occupancy certificate issued after
💡 Explanation:OC legalizes building use after code compliance
- Q46 Past Paper · PPSC/FPSC/NTS easy
Illegal construction risk includes
💡 Explanation:Unauthorized extra floors common enforcement issue in cities
- Q47 medium
High rise defined in many bylaws as building exceeding
💡 Explanation:Additional fire and structural rules apply
- Q48 easy
Parapet height and roof access guarded per code to prevent
💡 Explanation:Roof safety for equipment servicing
- Q49 Past Paper · PPSC/FPSC/NTS medium
Structural peer review required for
💡 Explanation:Third party check of calculations for tall buildings
- Q50 medium
Soil test minimum boreholes for high rise typically
💡 Explanation:Variability of urban fill requires adequate exploration
- Q51 Past Paper · PPSC/FPSC/NTS medium
Basement waterproofing required when
💡 Explanation:Karachi Lahore high water table needs tanking or drainage
- Q52 hard
Column splice location preferred at
💡 Explanation:Constructability and structural logic guide splice placement
- Q53 medium
Cantilever slab design checks
💡 Explanation:Balconies common failure point if under-designed
- Q54 Past Paper · PPSC/FPSC/NTS medium
Strengthening existing building for extra floor requires
💡 Explanation:Illegal additions cause collapses in dense urban areas
- Q55 easy
Building line on street defined in master plan as
💡 Explanation:Setback plus building line control streetscape
- Q56 Past Paper · PPSC/FPSC/NTS medium
Parking requirement in commercial zoning based on
💡 Explanation:CDA LDA require minimum off-street parking
- Q57 medium
Rainwater downpipe sizing based on
💡 Explanation:Plumbing code links drainage to local design storm
- Q58 medium
Lightning protection for tall buildings uses
💡 Explanation:Protection system per applicable standard where required
- Q59 easy
Minimum ceiling height residential often about
💡 Explanation:Ventilation and habitability standards
- Q60 medium
Party wall agreement needed when
💡 Explanation:Legal clearance for footing projection on boundary