Railway Airport and Harbour Engineering MCQs 2026
50 questions with detailed answers · 23 from past papers · 5 quiz batches available
Choose a Quiz Batch. Each batch has 10 questions from this topic, in order. Take them one by one to work through all 50 MCQs. Login to save your scores and see your best per batch.
Read each question, think about the answer, then click Show Answer to reveal the correct option and explanation. Load 10 at a time so it stays manageable — perfect for one-topic study sessions on the bus or during a break.
- Q1 Past Paper · PPSC/FPSC/NTS easy
Standard gauge for Pakistan Railways is
💡 Explanation:Broad gauge 5 ft 6 in is standard on Pakistan main lines
- Q2 Past Paper · PPSC/FPSC/NTS easy
Metre gauge corresponds to track width of
💡 Explanation:Metre gauge used on some branch lines historically
- Q3 Past Paper · PPSC/FPSC/NTS easy
Cant or superelevation on railway curves compensates
💡 Explanation:Rail cant balances lateral force at equilibrium speed
- Q4 medium
Transition curve on railways allows
💡 Explanation:Easement curve reduces jerk entering circular curve
- Q5 Past Paper · PPSC/FPSC/NTS easy
Turnout or points enable
💡 Explanation:Switch and crossing divert trains to siding or loop
- Q6 Past Paper · PPSC/FPSC/NTS easy
Ballast on railway track provides
💡 Explanation:Crushed stone ballast supports sleepers and drains water
- Q7 Past Paper · PPSC/FPSC/NTS medium
Concrete sleepers offer advantage of
💡 Explanation:PSC sleepers resist decay compared to wood in Pakistan climate
- Q8 hard
Railway track modulus depends on
💡 Explanation:Track system stiffness affects maintenance and speed
- Q9 medium
Maximum permissible speed on curve reduces with
💡 Explanation:Curve speed limited by cant deficiency and safety
- Q10 easy
Railway alignment in plains prioritizes
💡 Explanation:Economical alignment avoids unnecessary earthwork
- Q11 Past Paper · PPSC/FPSC/NTS medium
Runway orientation at airports uses
💡 Explanation:Runways aligned with prevailing winds for safe operations
- Q12 Past Paper · PPSC/FPSC/NTS medium
Crosswind component affects
💡 Explanation:Strong crosswinds limit aircraft control near ground
- Q13 Past Paper · PPSC/FPSC/NTS hard
Runway length requirements depend on
💡 Explanation:Performance charts account for altitude and heat in Pakistan
- Q14 Past Paper · PPSC/FPSC/NTS easy
ICAO standards govern
💡 Explanation:Pakistani airports follow ICAO annexes for safety
- Q15 easy
Taxiway connects
💡 Explanation:Taxiways route aircraft on ground
- Q16 easy
Apron area at airport accommodates
💡 Explanation:Apron supports passenger boarding and fueling
- Q17 Past Paper · PPSC/FPSC/NTS easy
Karachi Jinnah International airport serves as
💡 Explanation:KHI is busiest airport handling international traffic
- Q18 Past Paper · PPSC/FPSC/NTS easy
Breakwater in harbour protects
💡 Explanation:Breakwaters create calm water for berthing
- Q19 Past Paper · PPSC/FPSC/NTS medium
Rubble mound breakwater uses
💡 Explanation:Armour layers dissipate wave energy at Pakistani ports
- Q20 Past Paper · PPSC/FPSC/NTS easy
Dredging in harbour maintains
💡 Explanation:Sedimentation reduces depth requiring periodic dredging
- Q21 Past Paper · PPSC/FPSC/NTS easy
Berth is
💡 Explanation:Berths equipped with fenders and cargo handling
- Q22 Past Paper · PPSC/FPSC/NTS medium
Tidal range affects harbour design by
💡 Explanation:Large tides need longer berths and tidal basins
- Q23 medium
Fender system protects
💡 Explanation:Rubber or timber fenders absorb berthing energy
- Q24 medium
Navigation channel width depends on
💡 Explanation:Channel dimensions safe for largest design vessel
- Q25 Past Paper · PPSC/FPSC/NTS easy
Karachi Port and Port Qasim serve
💡 Explanation:Southern ports handle bulk import/export cargo
- Q26 Past Paper · PPSC/FPSC/NTS medium
Gwadar port significance includes
💡 Explanation:Gwadar provides strategic maritime gateway
- Q27 easy
Railway fish plate joins
💡 Explanation:Fish plates and bolts maintain rail continuity
- Q28 medium
Railway gauge widening on curves prevents
💡 Explanation:Curve widening accommodates rigid wheelbase
- Q29 medium
Minimum railway curve radius affects
💡 Explanation:Tighter curves need speed restrictions and superelevation
- Q30 Past Paper · PPSC/FPSC/NTS easy
Railway level crossing safety requires
💡 Explanation:Protected crossings reduce road-train collisions in Pakistan
- Q31 hard
Airport reference temperature affects
💡 Explanation:Hot days reduce engine thrust and lift at Pakistani airports
- Q32 medium
Runway gradient limit per ICAO is about
💡 Explanation:Excessive longitudinal slope affects aircraft operations
- Q33 medium
Precision approach path indicator PAPI shows
💡 Explanation:Visual aid for safe landing approach
- Q34 Past Paper · PPSC/FPSC/NTS medium
Harbour silting is caused mainly by
💡 Explanation:River mouths like Indus delta contribute harbour silt
- Q35 medium
Quay wall retains
💡 Explanation:Vertical or bulkhead wall supports port backfill
- Q36 hard
Mooring bollard capacity must exceed
💡 Explanation:Bollards secure vessels against wind and current
- Q37 easy
Railway station yard includes
💡 Explanation:Marshalling yards sort wagons for destination
- Q38 hard
Airport obstacle limitation surfaces protect
💡 Explanation:OLS restrict building heights near aerodromes
- Q39 medium
Turning basin in harbour allows
💡 Explanation:Circular water area for large ship maneuvers
- Q40 medium
Sleeper density affects
💡 Explanation:More sleepers per length improve load spread
- Q41 Past Paper · PPSC/FPSC/NTS hard
Railway creep is
💡 Explanation:Creep managed by anchors and regular maintenance
- Q42 Past Paper · PPSC/FPSC/NTS easy
Pakistan Railways main line connects
💡 Explanation:Main line is backbone of freight and passenger rail
- Q43 easy
Jetty extends
💡 Explanation:Piers and jetties reach deeper water
- Q44 medium
Wind shear near airports is hazardous during
💡 Explanation:Sudden wind change causes aircraft control problems
- Q45 medium
Railway rail section IS standard weight relates to
💡 Explanation:Heavier rail sections used on main lines
- Q46 hard
Airfield pavement design uses
💡 Explanation:Aircraft gear loads govern pavement thickness
- Q47 medium
Harbour entrance orientation minimizes
💡 Explanation:Entrance alignment reduces downtime from swell
- Q48 Past Paper · PPSC/FPSC/NTS medium
Railway subgrade in Pakistan requires
💡 Explanation:Poor drainage causes track settlement in rains
- Q49 medium
Runway end safety area provides
💡 Explanation:RESA reduces damage if aircraft undershoots
- Q50 hard
Dolphin structure in harbour supports
💡 Explanation:Dolphins stand in water away from quay edge